We met up with doug yesterday to lock down various project designs and began exploration into bottle labels. Travis is plotting some secret t-shirt thing… i’m afraid and confused?
I have to admit i had a slight reservation about a part of this design at first. It’s something you are locking yourself into for a relatively long time and you want to make a positive impression. Over the various stages and proofs though there was a direction and focus i didn’t see at first but later appreciated.
As we approach the closing date planning intensifies so we can have everything in place to start asap. Trades have all come in to scope the work and schedules and submitted their bids. Paul is drawing everything up so we can start our permit and licensing applications on day 1 with minimal issues. The building is in pretty good shape overall and there seems to be little construction work to do. How long will all of this take?